Drywall and paint are almost done

Drive to Fayetteville today to check on a renovation.

  • Drywall patches over plumbing repairs, rough electrical, wall removal is almost done.
  • Painting is almost done.
  • Next step is flooring. Wood floor repair, sanding, finishing. Repair to kitchen subfloor where lvp will be installed
  • Contractor made a good suggestion to replace with old bathroom sink with a new white vanity.

I’d love to have the renovation done and listed for rent in three weeks.

Share this on your favorite social media: